After the installation of the reinforced concrete diaphragm and its anchoring, we have successfully excavated the construction pit within the scheduled time frame according to the plans. As of August 2022, we have begun the installation of reinforced concrete piles under the foundations. The professional engineers at DAAKONN Investments have designed a total of 180 piles with a depth of 35 meters and widths ranging from 100 cm to 120 cm. This process has successfully commenced in coordination with the managers, engineers, and the cooperating company executing the reinforced concrete piles.